There are no comments.
The newly built temporary alternative road in Al Rayyan area.
Doha
The Public Works Authority, Ashghal, has announced two temporary closures and one partial diversion.
The year-long partial diversion will come into force on Monday on the street parallel to Al Amir Street, stretching 800m from its intersection with Kasr Al Rayyan Street towards Al Rayyan Interchange.
During this period, traffic will be diverted to an alternative road with the same number of lanes adjacent to the existing road.
The diversion is required to allow the construction of the bridge that will link Al Rayyan Road to Al Shamal Road via Al Amir Street, as part of the second phase works of Al Rayyan Road upgrade project, which will serve to reduce traffic congestion in Al Rayyan area and provide easy access to residential and commercial areas.
One of the temporary closures is applicable to one lane in each direction on the E-Ring Road and Najma Street, intersecting at Al Thumama Roundabout, in approximately 400m sections from Tuesday for four months.
Ashghal announced on Sunday that a newly constructed temporary roundabout will allow traffic around the construction works inside the roundabout.
The objective of the closure is to allow for the construction works needed to convert Al Thumama Roundabout to a signal-controlled junction, as part of the interim upgrade project on E-Ring Road and Najma Street, which will serve to reduce traffic congestion in the area.
The project works will include widening the E-Ring Road and Najma Street, developing the infrastructure utilities, upgrading drainage networks in the area, in addition to providing pedestrian and cyclist paths, street lighting, and landscaping.
The other temporary closure is to be implemented from Monday on Roundabout 23, in both the east and the west directions leading to Street 23 in the Industrial Area.
Al Kassarat Street will remain open in two other directions through the roundabout, Ashghal announced.
The subsidiary streets parallel to Al-Kassarat Street eastbound, and leading to the residential and commercial areas surrounding Street 23, will also be closed.
The closure is part of the construction works to develop Doha’s Industrial Area. The project aims to increase the capacity of roads and support the traffic flow, in addition to providing the area with integral infrastructure.
Ashghal will install road signs to inform motorists of the diversion and closure. The authority has requested all road users to abide by the speed limits, and follow the road signs to ensure safety.
There are no comments.
Saying goodbye is never easy, especially when you are saying farewell to those that have left a positive impression. That was the case earlier this month when Canada hosted Mexico in a friendly at BC Place stadium in Vancouver.
Some 60mn primary-school-age children have no access to formal education
Lekhwiya’s El Arabi scores the equaliser after Tresor is sent off; Tabata, al-Harazi score for QSL champions
The Yemeni Minister of Tourism, Dr Mohamed Abdul Majid Qubati, yesterday expressed hope that the 48-hour ceasefire in Yemen declared by the Command of Coalition Forces on Saturday will be maintained in order to lift the siege imposed on Taz City and ease the entry of humanitarian aid to the besieged
Some 200 teachers from schools across the country attended Qatar Museum’s (QM) first ever Teachers Council at the Museum of Islamic Art (MIA) yesterday.
The Supreme Judiciary Council (SJC) of Qatar and the Indonesian Supreme Court (SCI) have signed a Memorandum of Understanding (MoU) on judicial co-operation, it was announced yesterday.
Sri Lanka is keen on importing liquefied natural gas (LNG) from Qatar as part of government policy to shift to clean energy, Minister of City Planning and Water Supply Rauff Hakeem has said.